All reports are in PDF format (Adobe Reader required - a free download)
August 2011 R-F Main Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission. Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >
2010 Annual Inspection Report Summary
Each year an independent structural engineering service is commissioned to inspect the tower structure and identify any areas needing maintenance.
View Full Report >
2009 Annual Inspection Report Summary
Each year an independent structural engineering service is commissioned to inspect the tower structure and identify any areas needing maintenance.
View Full Report >
December 2009 R-F Main Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission. Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >
July 2009 R-F Auxilary Antenna Exposure Report
Exposure to R-F radiation is required to fall below a maximum level established as safe by the Federal Communications Commission. Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View Full Report >
Dausman Joins Tower Staff
Transitions to General Manager as Gene Zastrow retires
View Full Report >
Agreement Between Sutro Tower, Inc. and Neighborhood Groups
During the process of obtaining permits for the DTV Conversion Project three neighborhood associations surrounding Sutro Tower indicated their concern that information about the operation of the tower is not easily available to residents. They also identified some improvements to the neighborhood were not being addressed due to lack of funds. These groups and Sutro Tower, Inc. agreed to address these concerns and the resulting document was prepared and presented to the San Francisco Planning Commission at the project approval hearing and incorporated in the Commission’s action to approve the project.
View Full Report >
2008 Annual Inspection Report Summary
Each year an independent structural engineering service is commissioned to inspect the tower structure and identify any areas needing maintenance.
View Full Report >
Environmental Impact Report
The California Environmental Quality Act requires a study of the potential environmental impact of any major construction project and publication of the findings. The report is certified by the San Francisco Planning Commission after its review and a public hearing. Report is 79 pages; Comments and Responses is 145 pages.
View Full Report >
View Comments & Responses >