SAFETY & MAINTENANCE | TOWER INSPECTIONS | RF EXPOSURE LEVELS | EVENT INSPECTIONS

Tower Inspection Reports

All reports are PDFs


2023 Sutro Tower FWTB Field Inspection Report
View Report >

2023 Sutro Tower SGH Review of FWTB Field Inspection Report
View Report >


2022 Sutro Tower FWTB Field Inspection Report
View Report >

2022 Sutro Tower SGH Review of FWTB Field Inspection Report
View Report >


2021 Sutro Tower ERI Field Inspection Report
View Report >

2021 Sutro Tower SGH Review of ERI Field Inspection Report
View Report >


 

ABOUT THE REPORTS

Tower Inspection Reports
The annual tower structure inspection is conducted by an independent structural engineering service to identify any areas needing maintenance.

RF Antenna Exposure Reports
Exposure to RF (radio frequency) radiation is required to fall below a maximum level established as safe by the Federal Communications Commission.  Exposure levels in publicly accessible areas surrounding Sutro Tower are measured by an independent professional engineering consultant upon activation of any DTV antenna or upon any increase of power by a DTV antenna or at least every 3 years.
View RF Exposure Reports >

Sutro Tower antennas

AGREEMENT BETWEEN SUTRO TOWER, INC.
AND NEIGHBORHOOD GROUPS

During the process of obtaining permits for the DTV Conversion Project three neighborhood associations surrounding Sutro Tower indicated their concern that information about the operation of the tower is not easily available to residents.  They also identified some improvements to the neighborhood were not being addressed due to lack of funds.   These groups and Sutro Tower, Inc. agreed to address these concerns and the resulting document was prepared and presented to the San Francisco Planning Commission at the project approval hearing and incorporated in the Commission’s action to approve the project.
View Report >

_______________________________________

ENVIRONMENTAL IMPACT REPORT

The California Environmental Quality Act requires a study of the potential environmental impact of any major construction project and publication of the findings.  The report is certified by the San Francisco Planning Commission after its review and a public hearing. Report is 79 pages.
View Report >